| Project Name: | Project Location: |
| Completed by: | Date: |
ROLLING TOWER INSPECTION CHECKLIST
|
YES |
NO |
ACTION/COMMENTS |
|
| Scaffold components and planking in safe condition for use and planks graded for scaffold use? | |||
| Competent person in charge of erection and inspection? | |||
| Tower level and plumb? | |||
| Tower height less than four times the minimum base width? | |||
| Casters of proper size with effective locking devices which are locked when in use? | |||
| Screw jacks extended less than 12"? | |||
| Casters and all frames locked together? | |||
| Guard railing in place on all open sides and ends? | |||
| Horizontal diagonal bracing been positioned properly at base and intermediate levels of 20'. | |||
| Material secured before moving the scaffold? | |||
| Platform fully planked and toe boards provided where necessary? | |||
| Employees removed from the scaffold before it is moved? | |||
| Scaffold free of makeshift devices or ladders to increase height? | |||
| Conditions such as power lines, wind loading, etc. controlled? | |||
| Safe way to get on and off the scaffold without climbing on cross braces? | |||
| Personnel instructed in the safe use of the equipment? |